
Pink Line Metro Bangalore: Route Map, Connectivity, and Launch Timeline
The Pink Line Metro Bangalore is the most talked-about project in the city’s transport story. It is expected to change how people travel from south to north Bengaluru — making daily commutes faster, easier, and cheaper.
Key Takeaways
- The Pink Line Metro Bangalore connects Kalena Agrahara in south Bengaluru to Nagawara in the north.
- It will open in two phases in 2026 — elevated section first, then underground.
- There are 18 stations, including major interchanges with other Namma Metro lines.
- The line promises better connectivity, less traffic, and more travel choices for commuters.
What is the Pink Line Metro Bangalore?
The Pink Line will create a north-south spine that will connect the Namma Metro with a new corridor.
In simple words, it is a long metro route that:
- Runs from Kalena Agrahara in the south to Nagawara in the north.
- Covers about 21 km.
- Has both elevated and underground sections.
- Includes interchanges with other metro lines like Purple line metro , Yellow, Red, Orange, and Blue.
This new line is a big change for Bengaluru’s transport network, It connects far-flung areas and makes it easier to reach to offices, schools, hospitals, and the central business district.
Pink Line Metro Route Map & Station List
Let’s explore how the route looks stretch-by-stretch:
📍Overview :
|
Section |
Type |
Approx Length |
|
South Segment: Kalena Agrahara → Tavarekere |
Elevated |
~7.5 km |
|
North Segment: Tavarekere → Nagawara |
Underground |
~13.8 km |
|
Total Corridor |
— |
~21 km |
Pink Line Metro Route Station List (South to North)
|
Station Name |
Type |
|
Kalena Agrahara |
Elevated |
|
Hulimavu |
Elevated |
|
IIM-Bangalore |
Elevated |
|
JP Nagar 4th Phase |
Elevated |
|
Jayadeva Hospital |
Elevated |
|
Tavarekere |
Elevated |
|
Dairy Circle |
Underground |
|
Lakkasandra |
Underground |
|
Langford Town |
Underground |
|
National Military School |
Underground |
|
MG Road |
Underground |
|
Shivajinagar |
Underground |
|
Cantonment |
Underground |
|
Pottery Town |
Underground |
|
Tannery Road |
Underground |
|
Venkateshpura |
Underground |
|
Kadugundanahalli |
Underground |
|
Nagawara |
Underground |
Namma Metro Pink Line Route Video Guide
Here’s a popular video explaining the route and all station details:
How It Connects to Other Metro Lines
The Pink Line Metro in Bangalore provides excellent connectivity to all of the other Metro lines, These connections make it easier to travel to many parts of the city:
📍 Major Interchange Connections
|
Line |
Interchange Station |
Connectivity |
|
Yellow Line |
Jayadeva Hospital |
South-East Bengaluru |
|
Purple Line |
MG Road |
City Centre |
|
Red Line |
Dairy Circle |
North-East Bengaluru |
|
Orange Line |
JP Nagar 4th Phase |
West-South access |
|
Blue Line |
Nagawara |
North & Airport access |
Why the Pink Line Matters (Connectivity Impact)
Before the Pink Line opens, most people have to use the bus, car, or bike to travel over large distances across the city.
Here’s how the Pink Line changes things:
Benefits for Commuters:
- Faster journeys compared to road traffic.
- Easy access to IT parks, hospitals, schools, and business hubs.
- Better option for students and office workers.
- Fewer private vehicles on busy roads.
The daily transportation experience is more convenient and improved for riders because a metro runs on schedule and avoids road traffic.
Pink Line Route Map — Deep Dive
Let’s break the route into two parts:
1. Elevated Section: Kalena Agrahara → Tavarekere
This part runs above the road — mainly along Bannerghatta Road — a key route in south Bengaluru.
Why it’s important:
- This corridor connects many of the business districts in South Bangalore that see heavy traffic.
- The residents in the region travel here for jobs, school, and/or shopping.
2. Underground Section: Tavarekere → Nagawara
This large portion goes below ground through central areas like MG Road and Shivajinagar.
Important points:
- Passes under the city’s busiest zones.
- Avoids road jams and keeps trains running on time.
- Connects big commercial areas with residential parts and bus stands.
Underground metro lines take longer to build, but they give huge benefits in crowded cities like Bengaluru.
Launch Timeline: When Will the Pink Line Open?
Many people are excited and asking the same question: “When will the Pink Line start?”
Here is what I found on the most current project and construction schedule according to official sources:
📅 Expected Launch Dates
|
Phase |
Section |
Estimated Opening |
|
Phase 1 |
Kalena Agrahara → Tavarekere (Elevated) |
May 2026 |
|
Phase 2 |
Tavarekere → Nagawara (Underground) |
Dec 2026 |
This phased launch is because:
- Elevated section is easier to finish and test.
- Underground tunnels take more time due to complex work.
According to experts, this is a plan that will allow commuters to begin using part of the railway line before work is completed on elsewhere.
What’s Happening in Construction Now?
The metro project has seen progress and delays over the years. Some sections were planned for earlier dates, but timelines changed.
Latest construction insights include:
- Tunnelling work is mostly done for major underground parts.
- Safety and signal tests are ongoing before final approval.
- Prototype trains are being tested on tracks.
Once the line has been tested and certified as safe, also once approval is given, trains will be made available to transport passengers on a continuing basis.
Bangalore Metro Pink Line Timings (2026 Status)
Currently, as of 2026, the Pink Line of the Bengaluru Metro is still under construction. So, regular passenger train timings have not started yet.
However, BMRCL provided information regarding the planned operating hours of the Pink Line after it is opened to the public in 2026.
Expected Daily Timings
|
Service Type |
Time |
|
First train |
5:30 AM |
|
Last train |
11:00 PM |
|
Peak hour frequency |
Every 5–7 minutes |
|
Non-peak frequency |
Every 8–12 minutes |
These new train services will operate at the same times as the metro services that run on the Purple and Green Lines of Namma Metro.
Pink Line Metro Fare (Expected Ticket Prices)
The Pink Line Metro fare will follow the same pricing system used across the Namma Metro network.
Expected Fare Structure
|
Distance Travelled |
Approx Fare |
|
Up to 2 km |
₹10 |
|
2–5 km |
₹20 |
|
4–6 km |
₹30 |
|
6–8 km |
₹40 |
|
8-10 km |
₹50 |
|
10–15 km |
₹60 |
|
15–20 km |
₹70 |
|
20-25km |
₹80 |
Smart cards & QR tickets will give:
- 5% discount on every ride
- Faster entry and exit
- Cash-free travel
This makes metro travel cheaper than autos or cabs for daily use.
How to Purchase QR Tickets on WhatsApp?
The Bengaluru Metro has started selling tickets via WhatsApp, no need to stand in queues.
Steps to Buy Pink Line Tickets on WhatsApp
- Save this number: +91 81055 55555
- Send “Hi” on WhatsApp
- Choose Metro Ticket
- Select:
- From station
- To station
- Number of tickets
- Pay using:
- UPI
- Debit card
- Credit card
- You will get a QR code ticket
- Scan it at the metro gate and travel
Local Transport Connectivity from Pink Line Stations
The Pink Line Metro Bangalore is designed to provide seamless connectivity for city transit.
At Most Pink Line Stations You Will Find
|
Transport Type |
Availability |
|
BMTC buses |
Yes |
|
Auto rickshaws |
Yes |
|
App taxis (Ola, Uber) |
Yes |
|
Bike taxis |
Yes |
|
Parking for two-wheelers |
Yes |
|
Parking for cars |
At selected stations |
Major Transport Hubs on Pink Line
|
Station |
What You Get |
|
Jayadeva Hospital |
Buses, Yellow Line, autos |
|
MG Road |
Purple Line, city buses, taxis |
|
Nagawara |
Airport buses, Blue Line, autos |
|
JP Nagar 4th Phase |
Orange Line, bus stops |
Namma Metro Pink Line Contact Details
If you have questions or want updates you can contact BMRCL (Bangalore Metro Rail Corporation Limited).
Official Contact Details
|
Type |
Information |
|
Customer Care |
080-22969300 |
|
WhatsApp Support |
+91 81055 55555 |
|
|
customer.care@bmrc.co.in |
|
Website |
Latest News Updates on Bangalore Metro Pink Line Extension
The Pink Line Metro Bangalore is part of Phase-2 of Namma Metro.
Latest Official Updates (2025)
- Elevated section from Kalena Agrahara to Tavarekere will open first
- Expected launch: May 2026
- Underground section from Tavarekere to Nagawara will open by December 2026
- Train trials and safety checks are in progress
Conclusion
The Pink Line Metro Bangalore is more than just a new metro route. It is a major step toward making Bengaluru a better, faster, and more liveable city.
By connecting south Bangalore's Kalena Agrahara with north Bangalore's Nagawara, the Pink Line creates a significant amount of time savings, decreases congestion on our city streets, and creates an excellent daily travel option for our citizens.
The Pink line has 18 stations throughout the city, with several locations where you can change trains, as well as low-cost fares and making it the best way to get to work, school, home, or to take family members on outings for all citizens.
FAQs on Namma Metro Pink Line Bangalore
1)What is the status of Pink Line metro in Bangalore?
As of the beginning of 2026, Bengaluru's Pink Metro Line was still under construction. Several tests were performed and were still undergoing safety checks. It is expected to open for public use starting in phases in 2026.
2)Is Bengaluru's Pink Line metro line set to be ready by 2026?
Yes, The first phase of the elevated section of the Pink Line is expected to be opened in May of 2026. The second phase of the underground section of the Pink Line is expected to be opened in December of 2026.
3)Which metro line is going to Bangalore airport?
The Blue Line Metro will connect Kempegowda International Airport to the city. It will run from KR Puram to the airport via Hebbal and Nagawara
4)Is Bangalore Metro Pink Line open?
No, the Bangalore Metro Pink Line is not open yet. It is still under construction and is expected to start operations in phases in 2026
Eager to learn more about KOTS?
What is the application process like?
The application process is typically like a KYC process to get to know our customers.
What are the common lease terms?
The rental contract is for a standard of 11 months. However, you can choose how long you want to stay.
Can I renew my lease at the end of the term?
Yes, you have the option to renew your rental agreement whenever you wish to.
Is there any Commitment/Lock in period?
Lock in period is a commitment given by the tenants to us in order to avail free common area maintenance charge. Lock-in period should be a minimum of 6 months to avail free common area maintenance charge.
Can you renew or update only the lock in period?
No, once the contract is made you cannot update or change the lock-in period or any other terms.
Are they any hidden charges?
Being fair &transparent is our core value and we inform all our tenants about our terms &conditions in detail prior to the booking. There are no hidden charges or terms.
What is the difference between contract period and lock-in period?
Both aspects operate independently. Contract period is the 11 month legal term under which tenants will rent the flat with KOTS. Renewal of contracts is possible. On the other hand, the lock-in period refers to the duration for which the tenant commits to remain without terminating the contract, enabling them to take advantage of the free common area maintenance charges offered.
What happens if you terminate the contract (or) vacate the home during the Lock-In period ?
The common area maintenance charges offered will be reversed and you will be charged monthly common area maintenance charges for the entire stay duration.
Is there any notice period to terminate the contract?
Yes, the tenants have to serve 45 days notice period before they terminate the contract.
Are there any painting charges or move out charges?
Move out charges include painting charges to be paid (one time) by the Sub-Lessee in advance or in pre-paid manner at the time of booking the flat. If the rented flat is of Studio / 1BHK flat, painting charges are Rs 14,500 (Fourteen thousand five hundred.) and if the rented flat is a 2BHK flat, painting charges are Rs 19,500 (Nineteen thousand five hundred.).
Looking for personalised help?

